Optimizing Energy Costs with Solar Solutions for Surdex Steel
Surdex Steel, located in Dandenong South, Victoria, is one of Australia's
leading steel suppliers and processors, stocking over 10,000 steel products. The company engaged TGR to
address rising energy costs and identify a sustainable solution for peak-hour electricity
consumption.
The Challenge
Surdex Steel faced escalating peak-hour electricity costs, which significantly impacted their operational expenses. Although they had an existing Power Factor Correction (PFC) unit to manage load harmonics, it was insufficient for addressing their long-term energy efficiency needs.Project Objectives
Surdex Steel sought a comprehensive solution to:- Reduce peak-hour electricity costs
- Improve energy efficiency
- Transition toward sustainable energy alternatives
TGR’s Approach
After conducting an in-depth feasibility study, TGR analyzed site-specific load data and designed a tailored solar and battery storage solution to meet Surdex Steel's needs.
1
Stage 1: Installation of a 359 kW on-roof solar system, commissioned in
April 2023.
Results and Benefits
- Sustainability: Transitioned to renewable energy, reducing carbon footprint.
- Cost Savings: Significant reduction in peak-hour electricity costs
- Return on Investment (ROI): Estimated at 4-5 years.
- Scalability: Flexible design allows for future expansion in Stage 2.
Why Choose TGR?
TGR’s expertise in renewable energy solutions ensures businesses like Surdex Steel achieve measurable results. By integrating advanced technology and site-specific insights, TGR delivers sustainable, cost-effective energy strategies tailored to clients' needs.
Client
Surdex Steel
Location
Dandenong South, Victoria
Solution
359 kW on-roof solar system
Commissioning Date
April 2023
Estimated ROI
4-5 years