Powering Savings for Home DFO with Solar Solutions
Home DFO, a leading supplier and wholesaler of residential building materials and appliances, supports homes and developments across Australia. To cut down on high energy costs during business hours, the company partnered with TGR to implement an innovative energy solution tailored to its operational needs.

The Challenge

Operating six days a week (9 AM–5 PM), Home DFO faced substantial daytime electricity expenses, impacting their bottom line. While their existing electrical infrastructure supported operations, it required upgrades to accommodate a modern, sustainable energy solution.  

Project Objectives

The key goals of the project were:  
  • Reducing electricity costs during business hours
  • Upgrading outdated infrastructure to handle renewable energy systems
  • preparing for future scalability with an efficient and cost-effective solution

TGR’s Solution

TGR developed a phased approach based on a detailed feasibility study and load analysis. The solution addressed immediate energy needs while preparing for future expansion:

Stage 1:

  • Installation of a 70.56 kW solar system.
  • Comprehensive upgrades to the Main Switch Board and electrical cables across the entire building to support the new solar infrastructure.
  • Commissioned and operational since November 2021.

Results and Benefits

  • Cost Efficiency: Significant reduction in energy costs during business hours.
  • Future-Ready Infrastructure:Upgraded electrical systems ready for future expansions.
  • Sustainability:Lowered reliance on grid electricity, reducing carbon emissions.
  • Quick Payback Period:ROI estimated at 2-3 years, making the solution financially viable.

Why Home DFO Chose TGR

TGR’s ability to provide end-to-end project management, from feasibility studies to commissioning, made them the ideal partner. Their expertise in integrating renewable energy solutions with infrastructure upgrades ensured a seamless transition for Home DFO.

Project Summary

Client
Home DFO
Location
Campbellfield, Victoria
Solution
70.56 kW solar system with monitoring, upgraded electrical infrastructure, and maintenance services.
Commissioning Date
November 2021
Estimated ROI
2-3 years

Conclusion

The successful implementation of Stage 1 has positioned Home DFO for long-term savings and sustainability. With Stage 2 in the pipeline, the company is on track to enhance its energy independence and further reduce operating costs.  

Transform Your Business with TGR

Looking for ways to cut energy costs and boost efficiency? Contact Think & Grow Renewable today to explore customized energy solutions tailored to your business needs.